Initial Maintenance (IM) Operations: 00–04

p4 wm 00.04

The Initial Maintenance table lists all maintenance operations that are to be performed at the initial maintenance (IM) interval. Maintenance operation numbers are reference numbers used to help you find detailed instructions in this manual on the maintenance operations to be performed. All operations listed in the table, along with the operations listed in the applicable M1 maintenance interval table, must be performed to complete the initial maintenance (IM).

Table 1, Initial Maintenance (IM) Operations for Service Schedules I and II

Maintenance Operation Number

Initial Maintenance (IM) Operations for Service Schedules I and II

Check

00–05

M1 Maintenance Interval Operations: 00–05

31–4 Frame Fastener Torque Check

32–3 Suspension U-Bolt Torque Check

33. 5 All-Axle Alignment Check

42–13 Operating and Leakage Tests of the Bendix Automatic Drain Valve1

47–4 Tightening the Fuel Tank Band-Nut

Table 1, Initial Maintenance (IM) Operations for Service Schedules I and II

Note:
Document Number: 0000102039
Manual Publication Date: 2024-05-14
Topic Publication Date: 2025-04-02