Fuel-Operated Heater Check

p4 mm 83.03
  1. Start the BPHS and set the control knob to maximum heat. Run the heater for 15 minutes to achieve operating temperature, and clear old fuel from the lines.
  2. Verify that the unit completes the start-up cycle, and continues to produce warm exhaust.
Note:
Document Number: 0000103390
Manual Publication Date: 2024-05-14
Topic Publication Date: 2025-03-11