Initial Maintenance (IM) Operations: 00–04

p3 mm 00.04

The Initial Maintenance table lists all maintenance operations that are to be performed at the initial maintenance (IM) interval. Maintenance operation numbers are reference numbers used to help you find detailed instructions in this manual on the maintenance operations to be performed. All operations listed in the table, along with the operations listed in the applicable M1 maintenance interval table, must be performed to complete the initial maintenance (IM).

Table 1, Initial Maintenance (IM) Operations for Service Schedules I and II

Maintenance Operation Number

Initial Maintenance (IM) Operations for Service Schedules I and II

Check

M1 Maintenance Interval Operations: 00–05 M1 Maintenance Interval Operations: 00–05  
Frame Fastener Torque Check Frame Fastener Torque Check  
Suspension U-Bolt Torque Check Suspension U-Bolt Torque Check  
Checking the Drive Axle Alignment Checking the Drive Axle Alignment  
OperatingTests of the Bendix Automatic Drain Valve OperatingTests of the Bendix Automatic Drain Valve1  
Tightening the Fuel Tank Band-Nut Tightening the Fuel Tank Band-Nut  

Table 1, Initial Maintenance (IM) Operations for Service Schedules I and II

Note:
Document Number: 0000119825
Manual Publication Date: 2024-05-15
Topic Publication Date: 2024-11-22