Fuel-Operated Heater Check

49X mm 83.03.001
  1. Start the Dual HVAC System and set the control knob to maximum heat. Run the heater for 15 minutes to achieve operating temperature, and clear old fuel from the lines.
  2. Verify that the unit completes the start-up cycle, and continues to produce warm exhaust.
Note:
Document Number: 0000119475
Manual Publication Date: 2024-05-16
Topic Publication Date: 2024-10-31