Inspection of the Premier 690 Coupling

cen mm 31.05.000

Important: Before servicing the Premier coupling, refer to the Premier web site at www.premier-mfg.com for complete safety, operation, and maintenance instructions.

Warning: If at any time the 690 coupling is bound up (jackknifed), the 294 bolt MUST be replaced immediately! Do not use the coupling until the bolt has been replaced. In addition, carefully inspect the 690 coupling, drawbar, drawbar eye, front end assembly, and tail board for damage. Failure to do so may result in trailer separation from the truck while in use, resulting in serious personal injury or property damage.

The time-in-service of the 294 bolt located in the 690 coupling must be monitored, and maintenance performed as follows. See Fig..

For a new or replaced 294 bolt:

  • Record the date of installation.

6 months after installation date:

  • Remove the 294 bolt. Using dye penetrate or magnetic particle testing along the length of the bolt, inspect for fractures.

  • If the 294 bolt has no damage, install it and continue to use for another 6 months.

  • If the 294 bolt is fractured, DO NOT USE. Contact Premier Mfg. Co.

1 year after installation date:

  • Regardless of service duty, replace the 294 bolt with a new one.

  1. Linch Pin

  2. Handle

  3. Pintle Hook

  4. 294 Bolt

Fig. 1, Premier 690 Trailer Coupling

Note:
Document Number: 0000122024
Manual Publication Date: 2025-02-11
Topic Publication Date: 2024-06-04